You have two or three documents that are laid out differently, itemised differently, and priced differently. Ranking them by price is the one comparison that is guaranteed to mislead until the scopes are lined up.
Who this helps
A homeowner with two or three generator proposals laid out differently, itemised differently and priced differently.
When to read it
Read this with the documents open in front of you. It is a working method, not background reading.
What you can decide afterwards
Whether the proposals in hand describe the same project, and if not, what has to be answered before any price comparison means anything.
Quick answer
Normalise scope before looking at price. Work the documents in four passes: mark each scope item as documented, unclear or absent without looking at totals; separate fixed commitments from allowances, assumptions and exclusions; establish whether differences in equipment or coverage are deliberate or just different guesses at what you asked for; and compare what each commits to at completion. Ranking by price before those passes is the most reliable way to pick the wrong proposal.
What this chapter can help you determine
Which proposal is complete, which is missing scope, and exactly what to go back and ask each contractor.
Lining up proposals so the same item can be found in each.
What allowances, assumptions, exclusions, and alternates commit you to.
Comparing proposals that differ in equipment or transfer scope.
What the completion package should contain.
Four passes over the documents, in this order
First pass: is the same scope present in each?
Go item by item and mark each scope as documented, unclear, or absent. Do not look at the totals during this pass.
This points here when:
The proposals are laid out differently.
One document is substantially shorter than another.
Something you discussed is not written down anywhere.
If this is the wrong call: Comparing prices across documents that describe different projects, which is the single most common way households pick the wrong proposal.
Second pass: what is conditional?
Separate fixed commitments from allowances, assumptions, exclusions, and alternates. Each of these can move the final figure after signing.
This points here when:
A line item carries an allowance rather than a price.
A proposal assumes something about the property nobody verified.
An item is listed as by others or by owner.
If this is the wrong call: Treating a conditional total as a fixed price, and meeting the difference as a change order at the least convenient moment.
Third pass: are the differences deliberate?
Where proposals differ in equipment, coverage scope, or transfer arrangement, establish whether the difference reflects a different professional judgement or simply a different assumption about what you asked for.
This points here when:
Capacities or models differ between proposals.
One includes load management and another does not.
Transfer equipment differs in type or scope.
If this is the wrong call: Assuming the larger or more expensive specification is the more careful one, when it may only reflect a different guess at what you wanted.
Fourth pass: what happens after the work is done?
Compare what each proposal commits to at completion: start-up, handover, documentation, warranty registration, restoration, and any maintenance arrangement.
This points here when:
Maintenance is offered as part of the proposal.
Warranty terms are described in the proposal rather than the manufacturer's document.
Restoration of the site is mentioned only in passing.
If this is the wrong call: A completed installation with no documentation, unregistered warranty, and no agreed handover — problems that are difficult to correct later.
What you probably already know
What you asked each contractor for.
Which contractor you found easiest to deal with.
The headline price on each document.
Roughly what equipment each proposes.
What is commonly still unknown at this point
Which items are excluded, since exclusions are often stated once in small print.
What each allowance covers and what happens when it is exceeded.
Whether the warranty described is the manufacturer's or the contractor's, and what each covers.
Who is responsible for permits, inspections, and utility coordination in each document.
What the payment schedule ties to, and what triggers each stage.
Information to gather
Every proposal in writing. A verbal price is not a proposal and cannot be compared.
The exclusions section of each document, in full.
The manufacturer's own warranty document for the equipment proposed, obtained from the manufacturer.
Written answers to the gaps found in the first pass, from the contractor who left them.
What the payment schedule ties each stage to.
Questions to ask
What is excluded from this proposal that a complete project would require?
Which line items are allowances, and what happens if the actual cost exceeds them?
Which assumptions about this property does this proposal rest on, and who verified them?
How are change orders priced and approved once work has started?
What documentation will I have at completion, and who registers the warranty?
Who performs start-up, and what handover will the household receive?
When this does not apply
Only one proposal is in hand, so there is nothing to compare.
The proposals are verbal — a verbal price cannot be compared.
The question is whether to repair existing equipment rather than install new.
What would change the decision
An exclusion surfaces that changes what a proposal actually covers.
A contractor's written answer reveals an assumption nobody verified.
An allowance turns out to carry material risk.
The manufacturer's own warranty document differs from what a proposal described.
The scope checklist, item by item
Work down this list with each document open, marking every item documented, unclear, or absent. It is the same checklist the quote decoder runs on — the tool records your marks and returns the questions; this is the list itself, if you would rather work on paper.
Every scope item a complete generator proposal addresses.
Scope
Item
Ask if it is unclear or absent
Equipment
Proposed equipment, named
Which exact model is proposed, and why that one for this property?
Equipment
Equipment rating stated
What rating is proposed, and what determination was it based on?
Equipment
Transfer equipment specified
What transfer equipment is included, and what does it cover?
Equipment
Load-management components
Does this include load-management equipment, and which loads would it shed?
Electrical
Electrical scope described
What electrical work is included, and what is assumed about the existing service?
Electrical
Panel or service work
Is any panel or service work included, and what happens if it turns out to be needed?
Fuel
Fuel scope described
What fuel work is included, and who determined the supply is adequate?
Fuel
Fuel-supply adequacy assessed
Has a qualified fuel professional assessed the supply, and is that assessment written down?
Permits and utility
Permits — who obtains them
Who obtains the permits, and is the cost inside this price?
Permits and utility
Inspections — who arranges them
Who arranges inspections, and who attends them?
Permits and utility
Utility coordination
Which utility steps are required, who requests them, and how long do they take?
Site
Site work and access
What site work is included, and how will equipment reach the location?
Site
Pad or mounting surface
What is the equipment mounted on, and is that surface in this price?
Completion
Start-up and commissioning
Who performs start-up, and is it included here?
Completion
Owner handover or training
What will the household be shown at handover, and by whom?
Completion
Site restoration
What restoration is committed to, and what is explicitly excluded?
Completion
Warranty terms stated
Which warranty is described here — the manufacturer's or yours — and who registers it?
Completion
Maintenance arrangement
Is maintenance part of this proposal, and what does it commit each side to?
Commercial terms
Exclusions listed
What is excluded from this proposal that a complete project would need?
Commercial terms
Allowances identified
Which items are allowances, and what happens if the actual cost exceeds them?
Commercial terms
Payment schedule
What does each payment stage tie to?
Commercial terms
Change-order treatment
How are change orders priced and approved once work has started?
Commercial terms
Completion documentation
What documents will I hold when the work is finished?
What requires a qualified professional
The comparison is yours to make; the determinations inside each proposal are the contractor's. This handbook does not evaluate contractors, rank them, or assess whether a proposal is technically correct.
If two proposals disagree about what this property requires, that disagreement is resolved by a qualified professional inspecting the property, not by choosing the more convenient answer.
What this page cannot determine
Which contractor to hire.
Whether a price is reasonable for this market.
Whether a proposal's technical approach is correct.
Deliberately out of scope here:
Choosing a contractor, which this handbook does not do.
Judging whether a price is fair.
Any assessment of a named company.
Bottom line
The cheapest proposal and the most complete proposal are frequently not the same document, and you cannot tell which is which until the scopes line up. Completeness is yours to assess; technical correctness remains a professional judgement.
What to do next
Do this chapter's work on paper: Generator quote decoder. Record, item by item, what each proposal documents — and generate the questions for whatever it does not.
The next decision is Permits, inspections, and who approves a generator installation — Which approval tracks your project touches, who owns each one, and exactly what to confirm with your local authority — none of which can be answered generically, and all of which can be asked precisely.
What drives the cost of a standby generator project? — Which scopes this particular project contains, so that a price difference between two proposals can be traced to a scope difference rather than guessed at.
How to choose a generator installer — Which companies survive the checks you can actually perform, and what has to be in writing before the remaining choice is safe to make.
describe the project once to a local professional — Once the passes above have settled which proposal is complete, the remaining work is describing the project accurately rather than repeating it to each company in turn.